Home

Apparatus

Stations

Personnel

Alarms

Maps

Photos

Links

 



Butler County
Fire District # 3

911 N. Rose Hill Rd.
PO Box 383
Rose Hill, KS 67133
316-776-0401

Emergency: 911
 


 



 



Board of Trustees
Meet the Fire District
Board of Trustees
Click Here


Butler County
District # 5 Commissioner
Meet the Butler County
District # 5 Commissioner
Click Here


Contact Us
Via e-mail
Click Here


Website Questions
Contact
Capt. Kevin Webster
Click Here

Stations

Station #1
 


 

Butler County Fire District # 3
Station # 1
911 N. Rose Hill Rd
Rose Hill, Kansas 67133


ARCHITECT
RICHARD B. KRAYBILL, ARCHITECT
230 Laura, #105, Wichita, KS 67211
www.kraybillarchitect.com

Location: 
Rose Hill, Kansas
Total Square Feet: 14,795
Construction Period: May 2003 to Jan 2004

CONSTRUCTION TEAM
STRUCTURAL ENGINEER: Dudley Williams & Assoc. - 230 Laura, #200, Wichita, KS 67211
GENERAL CONTRACTOR: Martin K. Eby Construction - 610 N. Main Street, Wichita, KS 67201
ELECTRICAL ENGINEER: Johnson Engineering - 330 Laura, Wichita, KS 67211
MECHANICAL ENGINEER: Mechanical Consultants, Inc. - 254 Laura, Wichita, KS 67211

The new Butler County Fire District No. 3 facility is located in Rose Hill, in the South-Central region of Kansas. The client's primary concerns for this facility included durability, tempered by livability.

Western Butler County, in the Wichita, Kansas metropolitan area, has experienced prolific population growth over the last decade. It was Butler County's desire to have a facility that would handle near term growth and require relatively low maintenance over a fifty year life. The building site is at a high-visibility location on Rose Hill's main street, nestled amongst retail and residential developments. Full-view sectional overhead doors face the street, allowing local residents to see the personnel and equipment that help protect them.

The building provides ten fire apparatus bays and one ambulance bay. Medical equipment storage and a Biohazard Room are provided adjacent to the ambulance bay.

Mezzanine storage areas are stationed at the north and south ends of the vehicle bay area, with additional storage rooms at the main floor level. Interior vehicle exhaust ducts, water hoses, compressed air hoses and extra electrical outlets are accessible from each vehicle bay. Trench drains are also located at each bay. The bays are heated by radiant heaters and covered by a pre-finished metal ceiling with intermittent access panels.

Interior spaces were designed with quick access to the apparatus bay area as a top priority. The public entrance accesses a lobby, restrooms and a training/ conference room. Access control is provided to the remainder of the facility. Personnel within the primary crew office have a good view of the front lobby and can see through to the street.

To accommodate future 24 hour/day staffing, bunk rooms and shower facilities are provided for male and female staff-with flexibility to accommodate changing ratios. A comfortable break room with a full kitchen and lounge is also provided for off-duty crew.

To address the concern for durability, the building was designed to have a reinforced concrete masonry structure with a combination of brick and limestone veneer. Additional masonry reinforcing and a composite roof deck was engineered for the training room for storm protection. To provide a quality appearance and facilitate interior durability, the apparatus bay area was provided with sealed ground-face concrete masonry up to the door head height. Located in "Tornado Alley", this facility would be a viable emergency operations center with its storm shelter, backup generator and central location within Rose Hill.

Site circulation is managed by providing separate public and staff/emergency vehicle street entrances. Front and back approaches to apparatus bays were sized to allow for a large truck turn radius. A "faux stone" concrete wall was placed along one side of the fire station property both to tie in with walls used elsewhere in an adjacent residential development and to separate the property from an adjacent retail building.
 


 

Station #2
 

 
 
Front View of Station # 2
 
 

Butler County Fire District # 3
Station # 2
12484 SW 160th St
Rose Hill, Kansas 67133

Location: 
Rose Hill, Kansas
Total Square Feet: 1200
Construction Period: 1994

Station # 2 was constructed to meet the need for quicker fire responses in the northwest areas of the District. Station # 2 currently houses Engine 33 and Tanker 33. Construction is pole with wooden trusses and steel siding. It is fully insulated and heated. The east half of the structure is occupied by Pleasant Township and is used as their equipment facility.
 

 

 

 Fire Prevention
 Articles
 Safety
 Hot Topics
 Memoriam - LODD




Jason Johnson

1977-2006
Firefighter
Click here

Brandon Daley
1987-2007
Firefighter
Click here

Copyright 2004 Butler County Fire District # 3. All rights reserved.